Wada-Asso of mortar pump force feed construction

Explanation of each plan




The standard construction plan (A detailed page is displayed when clicking.)

Feature It is recommended in apartment house/store construction etc. of the newly-built construction.
Integrated piping length within 60m. Height vertical within 30m. Amount of total force feed within 15m^3.
The mortar pump can be used in the maximum performance.
Notes Three-phase grounded voltage source(200V, 30A) or 25KVA type dynamo.
It is necessary within 50m from the mortar pump.




Light construction plan (A detailed page is displayed when clicking.)

Feature It recommends it to the newly-built construction of small-scale apartment house/storeconstruction etc.
Integrated piping length within 40m. Height vertical within 20m. Amount of total force feed within 5m^3.
When it suits this condition, this plan is automatically applied.
It is cheaper thanThe standard construction plan.
Notes Three-phase grounded voltage source(200V, 30A) or 25KVA type dynamo.
It is necessary within 50m from the mortar pump.




Light construction plan with dynamo (A detailed page is displayed when clicking.)

Feature We will recommend this plan to the construction of reform/residence/apartment/store/earthworketc.
ntegrated piping length within 40m. Height vertical within 20m. Amount of total force feed within 10m^3.
The mortar pump can be used even when there is no power supply necessary for the
construction site.
Notes Because the dynamo cannot be unloaded from the track
The place where the track is put becomes indispensable from the mortar pump within 30m.
Most of the truck bed are occupied with 25KVA dynamo that brings it.
Therefore, the content of the lease is as follows.
・Mortar pump
・Mini hopper
・Net with vibrator
・Hose 40m
・25KVA dynamo

The agitator is not installed in the mini hopper.
Therefore, please prepare a considerably soft mortar.


In any plan, Customers need to be prepared. (water and cement, etc.) Please see details of each plan.