Details of Light construction plan |
Integrated piping length within 40m. Height vertical within 20m. Depth vertical within 10m. Amount of total force feed within 5m^3. (The piping fixation part of about 3m interval in the work stand etc. isnecessary for the vertical direction.) The business area: Tokyo, Kanagawa, Chiba, and Saitama. (Area that can reach on general road) Working hours: AM 7:00 - PM 5:00 (The installation time and the removal time are included). |
Cash fee on weekday: | Basic fee(Please inquire.) | - 3000 yen (including tax). |
Cash fee on Sunday/national holiday: | 10% surcharge of Basic fee | - 3000 yen (including tax). |
Cash fee on Night work: | 50% surcharge of Basic fee | - 3000 yen (including tax). |
The cash fee of the cancellation on that day |
|
Before laying pipes | 20000 yen (including tax). |
After laying pipes | 30000 yen (including tax). |
After setting up the pump | 100% of fee. |
Customers need to be prepared(Excluding the fee). |
1: | Three-phase grounded voltage source(200V,30A). |
It is necessary within 50m from the mortar pump. However, the voltage drop margin when starting is necessary for the dynamo. Therefore, 25KVA type dynamo is necessary.) |
2: | Tap water of water service. |
Volumes of water are necessary. |
3: | Cement is one usual bag (It is not deteriorated). |
4: | Installation location of mortar pump of about 5 - 6m^2. |
5: | Protection material. Mortar splashes by 3-4m of the surrounding of the mortar pump. It is necessary to protect it. |
It is necessary to protect the vicinity of piping and the vicinity of the construction place. |
6: | Number of workers necessary for work. |
The operator who accompanies the lease is only one person. In work for which the number of people is necessary, the worker is separately necessary. |